Installation
All Installation work will be carried out Professionally by Fully Experienced Engineers and in full compliance with the Water Supply (Water Fittings) Regulations 1999 thereby giving you complete confidence in the quality of installation workmanship carried out.
A branch will be taken from a wholesome drinking water supply via a rising main (or designated potable water supply via a managed tank, documentation must be supplied to 1st 4 Thirst before installation for verification).
Where possible the branch will be fitted via the hard plumbed (brass T piece) method with the pipe work being terminated with a ¾” BSP Male Threaded connection or a 15mm Compression Service Valve, to within 2 metres of the proposed cooler location.
Plumbing Installation
Any Micro bore tubing will be kept to a minimum and no more than 10 metres per Machine.
An additional Isolating tap will be connected just prior to the Equipment to allow ease of Filter Change or maintenance.
Filters where required or specified will be World Class Granulated Activated Carbon Odour & Taste Filters, rated at 5 micron absolute performance and will include a scale inhibitor to NSF, WRAS or European equivalent standards.
If you require any advice or help with any installation or plumbing issues please do not hesitate to contact us Contact us or Call 01753 655044